The method in the box

Seven phases, seven gates, eighty-eight tasks already written.

Open a new project and this is what is in it before you have typed anything. Trim it to your engagement rather than building one from an empty grid.

88Tasks, tagged to phase and workstream
7Phases, each ending in a gate
13Migration objects with reconciliation
10Readiness criteria across five dimensions

The seven phases

Each one ends where somebody has to sign.

Workstreams inside a phase run in parallel, the way they actually do, rather than in one long queue. You define what the workstreams are — the method supplies the shape, not the subject matter.

1

Discovery

Kickoff and charter, current-state review, gap analysis, requirements confirmed with the people who will have to live with them.

Feeds estimator, RAIDSets scope multipliers
Charter sign-off
2

Design

Solution design by workstream, integration specifications, migration mapping. The phase where scope is genuinely decided rather than discussed.

Produces the design documentFeeds migration tracker
Design sign-off
3

Build

Configuration, customisation, integration build, first draft data loads into a test environment.

Migration reaches draft loadedLongest phase
Build complete
4

Test

Scripts executed against written expected results, defects triaged P1 to P3, rework and retest, a rehearsal run under real conditions with the real sequence.

Drives the test trackerMigration reaches dress rehearsal
Test sign-off
5

Training

Train the trainer, end-user sessions by workstream, runbooks and quick-reference guides. Scored directly by the People dimension of the readiness scorecard, which is where optimistic launches usually fail.

Feeds readiness: PeopleProduces runbooks
Training complete
6

Go-Live

Cutover execution, final loads, reconciliation of every object, the go/no-go decision itself, and switch-on. The readiness score is the evidence the sponsor signs against.

Informed by 80% weighted readinessMigration reaches reconciled
Production sign-off
7

Post Go-Live

Stabilisation, defect burn-down, and the responsibility handover — billing cycles, contract administration, renewals, audit support — through to verified, which is the state that lets you actually leave.

Drives handover trackerEnds the engagement
Project closure

What is already filled in

The trackers are not empty either.

Seeding the plan and leaving the risk log blank would only move the blank-page problem one tab to the right. Every tracker opens with a realistic starting set.

7 RAID items

The risks that turn up on essentially every engagement of this shape, pre-scored on impact and probability and pre-assigned to the roles that usually carry them.

9 test scenarios

Each with its expected result already written — the step teams skip and then argue about when a result is disputed.

13 migration objects

The records that move from the old system to the new one, each ready for a source count, a loaded count and a reconciliation signature.

7 resource rows

The roles an engagement of this size needs, mostly waiting for names. The role text is what the plan matches demand against, so filling these in is what makes utilisation real.

10 readiness criteria

Specific ones, not placeholders — open P1 defects, integrations live, rehearsal timing confirmed, support plan active. Weighted across five dimensions to 1.00, threshold 80%.

Budget assumptions

A default rate, 10% expense contingency and 15% scope contingency, all of which you should change and all of which are visible rather than baked into task estimates.

First hour

What to do with it on day one.

The method is a starting point that expects to be cut. Most engagements delete a meaningful share of it in the first sitting, and that is the intended use.

  1. Set the engagement mode

    Advisory or delivery. This decides which tasks are in scope at all and re-prices the whole plan on the spot.

  2. Delete what does not apply

    Whole workstreams if your engagement does not have them. Be ruthless — a plan carrying tasks nobody intends to do is how percent complete stops meaning anything.

  3. Rename the workstreams to your work

    The seeded ones are named for a system implementation. Change them to whatever your engagement is actually made of; nothing downstream depends on the wording.

  4. Set scope multipliers

    Leave 1 where the client is typical. Push to 1.5 where you already know it will be hard. This is where your judgement about this specific client enters the numbers.

  5. Name the resources

    Put real people against the role rows, matching the role text exactly to what the plan uses. Then read the unstaffed hours number.

  6. Weight the readiness scorecard

    Export the readiness CSV, adjust the ten criteria to what your firm has learned actually predicts a bad launch, keep the weights summing to 1.00, and import it back.

  7. Export it as your firm's baseline

    Once it fits how you work, export the whole project as JSON. That file starts every future engagement, and the method stops being ours.

The shape transfers further than the wording does. Phases, gates, a readiness score, migration reconciliation and a handover register are not specific to any industry — they are what structured delivery work has in common. The seeded task list is one worked example. Load your own method instead →

Open a project and it is already populated.

88 tasks, seven gates, thirteen migration objects and a readiness scorecard waiting for scores.