A method, not a template.

A template gives you column headings. A playbook gives you the eighty-eight things that have to happen, in the order they have to happen, with the sign-offs that stop a bad go-live and the trackers already populated to catch what goes wrong.

Available now

One playbook, and it is a real one.

We would rather ship one method that has actually been used than five that were generated to fill a page.

Ships today

The method in the box

Seven phases from discovery to project closure, with a sign-off row at the end of each. A large share of it is data, training and handover work rather than configuration.

  • 88 seeded tasks
  • 7 phases
  • 7 gates, one per phase
  • 13 migration objects
  • 9 UAT scenarios, expected results written
  • 7 seeded RAID items
  • 10 readiness criteria
  • 5 readiness dimensions
  • 7 resource rows, mostly unnamed

Open the method

The seeded tasks are written as a system implementation because that is the most demanding version of this shape. Phases, gates and the readiness model carry to any phased engagement — you edit the task wording, not the structure.

In development

Two more, honestly labelled.

These are being written. They are not in the product today and we are not going to put invented task counts on them to make the page look fuller.

Coming

Client onboarding

Kickoff through first invoice. Contracting, access provisioning, discovery, systems setup and the 30-day check-in — the engagement shape that sits in front of every delivery project and never gets a plan of its own.

tasks
phases
gates
Coming

System selection & RFP

Requirements gathering, vendor long list, scripted demonstrations, a scoring matrix that survives contact with a steering committee, and the recommendation pack at the end.

tasks
phases
gates

Want one of these sooner, or a different one entirely? Tell us what you run — the order they get built in is driven by what firms actually ask for.

Bring your own

Your method, loaded once, reused forever.

Most firms that have been delivering for a decade already have a method. It lives in a spreadsheet somebody maintains, gets copied at the start of each engagement, and drifts into nine slightly different versions.

Because every tracker imports from CSV, yours becomes the thing you start from instead.

  1. Export your current plan

    From a spreadsheet, a scheduler, whatever you keep it in now. You need task names, phases, hours and roles.

  2. Map it to the WBS template

    Sixteen columns, of which only two are required. Fill the ones you have and mark your gate rows with the gate flag.

  3. Import and check the preview

    Nothing is written until you approve what it says it will do.

  4. Export the whole project as JSON

    That file is now your firm's starting point. Every new engagement begins from it.

How importing works

The readiness scorecard is the part worth customising first. The ten shipped criteria are a reasonable default, but every firm has learned the hard way about one specific thing that has to be true before a go-live. Put yours in, weight it heavily, and it will refuse to be optimistic on your behalf.

What transfers between platforms

The phase structure, the gate positions, the readiness dimensions and the migration reconciliation model are not industry-specific. What changes between one engagement and the next is the wording of individual tasks and which workstreams exist.

That is a find-and-replace on a CSV, not a rebuild.

Start from a method instead of a blank grid.